The Ranch Final Master Plan

The final Master Plan Vision for The Ranch at St. Cloud is a culmination of the entire planning process. The design direction of Concept 3, which focused on passive recreation on the east side of the site, was the basis for the Master Plan. The final design of the east side of the site reflects the public, City of St. Cloud staff, and City Council’s desires for conservation and environmentally sensitive uses of The Ranch, and a site that provides a range of passive recreation opportunities. The final Master Plan evolves Concept 3 (to review concept plans check the Master Plan Report) with changes focusing on cost effectiveness and the creation of a phasing plan for logical implementation. The entrance road on the east side of the site is straightened out to reduce pavement. The canopy walk provides a unique, immersive experience that has a high construction cost. The final Master Plan reduces the linear feet of the canopy walk and ties it into an on-grade trail system that would still provide the experience of walking through the trees, just for a shorter distance. The group tent camping area was also relocated to the east side of the site in the final Master Plan. 

The original location on the west side of the site provided access challenges, such as nearby parking, utilities and a restroom. Including the camping on the east side of the site gives campers access to the playground, ropes course, restroom, the trail system, and large open green spaces. The heart of the site on the north side along Jones Road remains an event area focusing on the existing building that already has been activated by the City and is a popular rental facility and festival venue. The gardens and amphitheater provide a backdrop for community gatherings. The west side of the site will continue to showcase the lake—keeping the beach and adding a kayak launch and boardwalks. The entire site is linked together with a trail experience that will traverse green space, nature, water, and unique venues that create an experience that is distinctly The Ranch at St. Cloud.

The Ranch Master Plan Phasing Plan and Cost Estimate Page 001.jpg

Public Workshop Opportunity...

A public workshop will take place October 14, 2023 from 10 am - 2 pm during the Ranch Fall Festival (click for more information). 

Phasing the Master Plan

The phasing plan breaks The Ranch into four areas and depicts a logical order for the elements to be constructed. Factors such as budget, community needs, environmental impact, and logistics were considered. Each phase serves as a standalone project, allowing the park to remain partially operational and accessible to the public while additional phases are being developed. This approach ensures improvements to the park can be introduced gradually, while still aligning with the Master Plan vision and the City’s financial. To review details for each phase, please check the Master Plan Report 